Creat membership Creat membership
Sign in

Forgot password?

Confirm
  • Forgot password?
    Sign Up
  • Confirm
    Sign In
Creat membership Creat membership
Sign in

Forgot password?

Confirm
  • Forgot password?
    Sign Up
  • Confirm
    Sign In
Collection
For ¥0.57 per day, unlimited downloads CREATE MEMBERSHIP Download

toTop

If you have any feedback, Please follow the official account to submit feedback.

Turn on your phone and scan

home > search >

Scheduling Method for MTS/MTO Production System

Author:
Tadeuz   A Maruf  


Journal:
IOP Conference Series: Materials Science and Engineering


Issue Date:
2016


Abstract(summary):

In order to fulfil the demand from customers, company can carry out its production activities using several policies. There are two policies which are commonly used, Make-to- Stock (MTS) and Make-to-Order (MTO). Both of these policies not only can be implemented separately, but also can be combined on a production floor, for example in foundry which the production activities have a flowshop characteristic. This paper proposes a Base-Stock Control System (BSCS) model to classify each incoming orders into the category of MTS and MTO. Each incoming orders will be first classified into the category of High Volume (HV) and Low Volume (LV). All products in these two categories will be and scheduled using two alternative methods, the First-In-First-Out (FIFO) and Priority Rule (PR). The production activities are scheduled by considering the capacity of each work station and performed in batch using overlapping operations. Several scenarios conducted on the proposed method reveals production delay reduction from 36% to 5.3% and also the total amount of finished products in ten months horizon planning by approxi mately 66.6%.


VIEW PDF

The preview is over

If you wish to continue, please create your membership or download this.

Create Membership

Similar Literature

Submit Feedback

This function is a member function, members do not limit the number of downloads